Measure lost capacity from late packaging materials

Compare the output lost when packaging materials arrive late with the time and product mix of an approved alternative campaign.

Italiano

Start the clock when the line would have been ready for the planned order. Record what is truly missing, when the material can be verified and which approved jobs are ready. Compare scenarios in the same window and keep outputs from different SKUs separate.

Worked decision for a 90-minute material delay

Illustrative waiting and resequencing comparison
ChoiceTime in the missing-material windowProduction consequence
Wait for the planned material90 min waiting.At a verified 60 accepted packs/min, 5,400 planned packs are deferred.
Run an already approved alternate SKU15 min entry change, 50 min running, 20 min change back.85 min used, leaving 5 min in the example window. The output belongs to the alternate order.
Confirm material at arrivalRecord time, lot and release for the original pack.Recalculate the next window for the original order.

Choose based on orders and verified material availability

The alternative occupies most of the waiting window but does not recover the original SKU’s output. Compare customer deadlines and any product, cleaning or release approval needed before committing to the switch.

Record actual arrival and the final production sequence. For repeat delays share which material blocked the longest ready-to-run window and whether the equipment can support a simpler approved change.

Review the complete line guide for product, packaging and changeover requirements

Send the material delay and resequencing record with actual delivery time, format change durations and orders deferred.